Domain 4: ACI 230.1R-Report on Soil Cement

Question 1

On an in-place soil-cement base, cement-delivery records reconcile with the specified application rate and field density meets the compaction requirement. The finished surface is uniformly gray. Full-depth inspection holes, however, expose streaks of untreated soil and unmixed clods near the bottom. Which requirement is most directly contradicted by this evidence?

Show answer & explanation

Correct answer: D - Uniform incorporation of soil, cement and water through the treatment depth.

Domain 5: ACI 301-Specifications for Structural Concrete

Question 2

The approved shore-removal plan for a cast-in-place member requires a field-cured cylinder strength of at least 3,500 psi and a specified removal sequence. At seven days, properly field-cured specimens representing that member give 3,900 psi; standard-cured companions give 4,400 psi. The concrete's specified strength is 5,000 psi at 28 days. All other release conditions have been verified. What is the appropriate disposition?

Show answer & explanation

Correct answer: D - Permit the approved removal sequence and retain the planned 28-day acceptance testing.

Domain 6: ACI 304R-Guide for Measuring, Mixing, Transporting, and Placing Concrete

Question 3

An approved concrete mixture contains 1,530 lb of sand in the saturated-surface-dry condition. The sand absorption is 2.0%, and today's total moisture content is 6.0%; both percentages are based on oven-dry mass. Other ingredients are unchanged. Which adjustment preserves both the specified sand quantity and effective mixing water?

Show answer & explanation

Correct answer: D - Batch 1,590 lb of sand; reduce separately added water by 60 lb.

Domain 11: ACI 309R-Guide for Consolidation of Concrete

Question 4

A slipform paver repeatedly pauses while awaiting concrete, but its internal vibrators continue running at the normal paving setting. Grout-rich patches appear at the stopping locations; fresh-concrete tests taken before paving remain within specification. Which change most directly addresses the observed problem?

Show answer & explanation

Correct answer: A - Stop vibration whenever forward movement stops, and coordinate its restart with paving.

Domain 14: ACI 327R-Guide to Roller-Compacted Concrete Pavements

Question 5

A roller-compacted concrete (RCC) pavement mat has a shiny, pasty surface and pumps under both the roller and foot traffic. The supporting base is firm, the lift thickness is correct, and additional vibratory passes are not achieving the target density. Which condition should be investigated first?

Show answer & explanation

Correct answer: A - A mixture too wet to remain stable under the compaction equipment.

Domain 16: ACI 345R-Guide for Concrete Highway Bridge Deck Construction

Question 6

About 90 minutes after a bridge-deck placement, while the concrete remains plastic, narrow cracks appear directly above and parallel to the upper reinforcing bars. The deck has shown noticeable bleeding and settlement. Wind is light, the surface remains moist, and survey checks show no form movement. Which mechanism best fits these observations?

Show answer & explanation

Correct answer: B - Plastic settlement restrained locally by the upper reinforcing bars.

Domain 19: ACI MNL-2-Manual of Concrete Inspection

Question 7

A bridge-deck mixture contains structural lightweight coarse aggregate. Its specified fresh-concrete air content is 5.0% to 7.0%. Tests on the same representative sample give 8.0% with a pressure meter and 5.6% by ASTM C173's volumetric method. Both meters are calibrated, and the volumetric test meets all procedural validity checks. How should the air-content requirement be evaluated?

Show answer & explanation

Correct answer: A - Use the volumetric result of 5.6%; it meets the specified air-content requirement.

Domain 21: CRSI Manual of Standard Practice

Question 8

Before a bridge-footing placement, an inspector finds a uniform, tightly adherent rust film on uncoated reinforcing bars. There is no loose scale, oil, mud, or other bond-impairing contamination. Representative hand-wire-brushed specimens meet the applicable ASTM requirements for mass, dimensions, and deformation height. All other preplacement checks have passed. What should the inspector do?

Show answer & explanation

Correct answer: B - Accept the bar condition and proceed with the scheduled concrete placement.

Domain 22: Plans-Reading Exam

Question 9

Joint detail J1 specifies smooth dowels across a transverse contraction joint, with bond breaker on the designated half. Detail J2 specifies deformed tie bars across a longitudinal joint. Both bar types have factory-applied epoxy corrosion protection. An installer proposes applying bond breaker to the full length of both types. Which installation preserves the intended joint behavior?

Show answer & explanation

Correct answer: C - Keep the tie bars bonded and apply dowel bond breaker as J1 details.

Question 10

A bearing layout places the pier centerline and the anchor-group centerline on the same survey baseline. The permitted deviations are ±1/2 in. for the pier and ±1/4 in. for the anchor group. Surveyed deviations are +0.30 in. and +0.40 in., respectively. The foreman argues that the two tolerances may be added. What should the inspection record show?

Show answer & explanation

Correct answer: C - The pier complies, but the anchor group exceeds its own location tolerance.

The rest of the CTCI blueprint

The CTCI exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more CTCI questions with explanations.

Continue in the free practice test →

View plans